Deepwater Facility

Two bridges for connection to offshore barges provide depths from 60-100 meters, depending on position and barge choice (Barges are installed on a project specific basis).

The mooring facilities were designed for the mooring of the Troll concrete platform during hook-up and commissioning and include 2 x 750 ton tripods / Ultra Heavy Duty Bollard Points.

Building Troll B, 94/95:

Troll B.jpg

Non-permanent deepwater facility (installed on a project specific basis):

Tripod_dypvannskai.jpg