Reference projects - Scope of work:

Below please find the rig scope of work handled by BGHT on reference projects. In addition, BGHT has delivered general yard services to all projects.

Year

Rig (Rig Owner)

Project

2012

Safe Scandinavia (Prosafe)

IRM & Modification works

 

Transocean Leader (Transocean)

5y SPS

 

Safe Scandinavia (Prosafe)

IRM & Modification works

 

Safe Regalia (Prosafe)

IRM & Modification works

 

 

 

2011

Safe Caledonia (Prosafe)

IRM & Modification works

 

Transocean Winner (Transocean)

5y SPS

 

Safe Scandinavia (Prosafe)

IRM & Modification works

 

Deepsea Atlantic (Odfjell)

IRM & Modification works

 

Safe Scandinavia (Prosafe)

IRM & Modification works

 

 

 

2010

Deepsea Atlantic (Odfjell)

IRM & Modification works

 

Safe Scandinavia (Prosafe)

IRM & Modification works

 

 

 

2009

Songa Trym (Songa Offshore)

IRM & Modification works

 

Transocean Arctic (Transocean)

5y SPS

 

Polar Pioneer (Transocean)

5y SPS

 

 

 

2008

Transocean Searcher (Transocean)

IRM & Modification works

Reference Projects - Scope of Work:

In addition to rig scope of work, BGHT delivers general yard services on all projects:

2011                                                                                                               

SAFE CALEDONIA, December 2011 (7 days)        

  • Project Managemnet
  • Gangway Height Extension
  • Logistics
  • General Yard Services

TRANSOCEAN WINNER, Autumn 2011 (65 days) 

  • Complex lift of Derricl A-frame, Crown Block etc.
  • Surface Treatment
  • Logistics
  • Security and Fireguards
  • General Yard Services

SAFE SCANDINAVIA, October 2011 (7 days)        

  • Project Management
  • Scaffolding
  • Gangway Height Extension (removal & reinstallation)
  • Fabrication Shop Roof (repair)
  • Drain bottom plugs (repair)
  • Vessel signs (surface treatment)
  • Doors with Coamings  (removal & reinstallation)
  • Sanitary Discharge Systems (installation)
  • Boiler Exhaust (installation)
  • General Yard Services         

DEEPSEA ATLANTIC, August 2011 (10 days)       

  • Project Management
  • APV-system (upgrade)
  • Repair cracks pontoon
  • Anchorchainstoppers (demount./remount.)
  • Seawatervalves (replace)
  • Anodes ballast tanks (inspec./inst./paint )
  • Thermal oil (install isolation valves)
  • Tank cleaning
  • General Yard Services

SAFE SCANDINAVIA, March 2011 (9 days)

  • Project Management
  • Gangway Height Reduction (removal & reinstallation)
  • Modification of Intermediate Access Platform
  • Boiler exhausts (prefab & install)
  • Renewal ROXTEC deckhead fitting(replacement)
  • SB exhaust coating & external pipework (install new pipework)
  • General Yard Services

2010

DEEPSEA ATLANTIC, 2010 (190 days)

  • Project Management
  • BOP - Replacement
  • Work in HPU-room (hyd. piping)
  • Upgrade N-Line Tension (piping, complete)
  • Cranes (access platforms, Prefab & install.)
  • Access pl.form BOP (prefab. & install)
  • Mud Mix system (electro & mech./piping)
  • Monorail (Upgrade system)
  • Control panel (relocation)
  • Mod. of LMRP (parking frame)
  • General Yard Services   

SAFE SCANDINAVIA, Nov. 2010 (7 days)   

  • Project Management
  • Gangway Height Reduction (removal & reinstallation)
  • Inspection of 12 ea Fairleads
  • Watertight Doors (install. & refit)
  • Replacement of grating on aft lifeboat piers
  • General Yard Services
     

2009

TRANSOCEAN ARCTIC, Autumn 2009 (90 days) 

  • Project Management
  • Upgrade of pipe handling crane
  • Pulling and re-installation of all thrusters
  • Exhaust modifications
  • Overhaul of BOP skidding system
  • Class assistance services
  • Piping
  • Low pressure mud
  • Fire water main
  • Sounding pipes
  • Fresh water
  • All support services
  • Scaffolding
  • BES Guards
  • Logistics
  • Marine operations & diving
  • Repairs
  • Pontoons
  • Fairleads
  • Anchor winch pockets
  • Anode replacement
  • Watertight door replacement
  • General Yard Services

SONGA TRYM, Oct. 2009 (18 days)            

  • Project Management
  • Repair pontoons and bulkheads
  • Remove and replace ballast valve
  • Repair fairleads
  • Repair bolsters
  • Support rig works
  • Support SIMP and class inspection
  • All support services
  • Painting
  • BES Guards
  • Scaffolding
  • Marine operations
  • General Yard Services

POLAR PIONEER, Summer 2009 (90 days)

  • Project Management
  • Install new 50t SB Crane
  • Remove PS crane and switch old SB crane to PS
  • Pulling and re-installation of all thrusters
  • Class assistance services
  • Piping
  • Ballast
  • Fire main
  • Fresh water
  • All support services
  • Scaffolding (above deck)
  • Painting (above deck)
  • Marine operations & diving
  • Repairs
  • Heli-Deck upgrade     
  • General Yard Services 

2008                                                                     

TRANSOCEAN SEARCHER, Nov. 2008 (25 days)

  • Project Management
  • Removal of a Mezzanine deck and install new crane boom support
  • Install new ROV winch
  • Overhaul BOP cursor frame
  • Overhaul sheaves
  • Support rig works
  • Class assistance services
  • All support services
  • Surface Treatment
  • Scaffolding
  • Repairs
  • General Yard Services